Electronic Tolling

Toll Calculator

What is Full Electronic Tolling?

  • Full electronic tolling will make Westlink M7 one of the most advanced motorways in the world
  • There will be no toll booths or boom gates and drivers will travel seamlessly at motorway speeds for 40 kilometres
  • Advanced technology will identify each vehicle by its electronic tag or its number plate as it passes under gantries at the entry and exit points along the road
  • All existing motorways in Sydney have cash booths – these can cause traffic congestion, especially at peak periods
  • Transurban will develop and operate the tolling and customer management system for Westlink M7 using the advanced technology that Transurban developed and uses on Melbourne’s CityLink motorway – currently Australia’s only full electronic toll road

Benefits of Full Electronic Tolling

  • No stopping or slowing down to pay tolls
  • Travel times are reduced and travel time certainty is increased
  • No need to worry about exact change because tolls are automatically deducted from the driver’s account
  • There will be other payment options for infrequent users who choose not to set up an account
  • Less traffic congestion because traffic does not have to slow down at toll booths
  • Less noise and air pollution, substantial fuel savings and less wear and tear on vehicles because there is no stopping and starting

How much will it cost?

  • On Westlink M7, motorists will only pay for the distance that they travel. Driving on Westlink M7 will be cost effective for short local trips as well as for longer journeys
  • The toll has been set at $0.25 per kilometre (2000 dollars, adjusted for CPI)
  • The toll for trips longer than 20 km has been be capped at $5.00 (2000 dollars, adjusted for CPI)

Estimated Time Savings

The following travel time saving estimates from Roads and Traffic Authority, NSW, are based on predicted traffic conditions for 2006. They are based on factors including predicted traffic volumes and patterns and may vary depending on the time of day and the route used.

Journey

Estimated time saving (Roads and Traffic Authority, NSW)

M5 to M2

65 minutes

Elizabeth Drive to Horsley Drive

9 minutes

Prestons to Eastern Creek

21 minutes

Pennant Hills to Wetherill Park

42 minutes

M5 to Cowpasture Road

11 minutes

 

Latest News
September 2008

2008 Blacktown City Art Exhibition
  General Manager Rachel Johnson said Westlink congratulates all the local artists who participated in this year’s, Blacktown City Art Exhibition.
  more +
September 2008

Light Horse Interchange Ramp Closures
  M7 Northbound and Southbound ramps to M4 CLOSED - Sunday 28th – Monday 29th September. M4 Eastbound and Westbound ramps to M7 CLOSED - Tuesday 30th September – Wednesday 1st October (9pm to 4:30am).
  more +
September 2008

CPI Toll Adjustment From 1 October 2008
  A Consumer Price Index (CPI)-indexed toll adjustment on the Westlink M7 will take effect from the beginning of October 2008.
  more +